Edenwald Houses
Project Highlight:
This project was a full electrification of a NYCHA complex, eliminating the central boiler plant and installing a Daikin MegaQ system at each of the 12 buildings. Each building now runs off its own all-in-one electrified skid — a pre-built unit packed with pumps and digital controls — allowing the entire complex to operate completely fuel oil and gas free.
Applications:
Public Housing / Electrification
Daikin Solutions:
(82) MegaQ Units for Domestic Hot Water